Switch language:简体中文 | English

Professional aluminum plate production and wholesale manufacturer

We have been focusing on customized design of aluminum veneer for many years, and choosing us is not wrong!

Information Hotline:

+86 15627778610

Supreme Building Materials (Guangdong) Co., Ltd

Industry information

Company News

Industry dynamics

Frequently asked questions

contact us

Mobile:+86 15627778610

Email: 2201229786@qq.com

Address: No. 5 Binjiang Road, High tech Zone, Zhaoqing City, Guangdong Province

Installation techniques for hyperbolic aluminum veneer

  • Author: Supreme Building Materials (Guangdong) Co., Ltd
  • Release time: 2022-03-12 12:14:44
  • Click:0

双曲铝单板的安装技巧



hyperbolicAluminum veneerAs a new type of building material, its application in modern architecture is becoming increasingly widespread. The installation technique is crucial for ensuring its aesthetics and stability. Below is a detailed introduction to the installation techniques of hyperbolic aluminum veneer.

1、 Preparation work

Before installing the hyperbolic aluminum veneer, the following preparations need to be made:

1. Determine installation location: Determine the installation location and quantity of hyperbolic aluminum veneer according to the requirements of the building structure and design.

2. Check material quality: Check whether the quality and specifications of the hyperbolic aluminum veneer meet the requirements, and whether the surface is flat, without obvious damage or scratches.

3. Prepare tools and equipment: Prepare necessary tools and equipment, including drills, screwdrivers, level gauges, cutting machines, etc.

2、 Installation steps

When installing hyperbolic aluminum veneer, the following steps need to be followed:

1. Measurement and Marking: Use a spirit level and measuring tools to measure and mark the installation position of the hyperbolic aluminum veneer.

2. Slotting and Drilling: Based on the measurement results, use tools such as drills and screwdrivers to slot or drill holes in the installation position of the hyperbolic aluminum veneer.

3. Installation of keel: Fix the keel on the wall or ceiling according to the design requirements, and ensure that it is flat and firm.

4. Installation of hyperbolic aluminum veneer: Place the hyperbolic aluminum veneer on the keel according to the design requirements and fix it to the keel with screws or other fasteners. It should be noted that the installation of hyperbolic aluminum veneer should be kept flat and vertical.

5. Gap treatment: Leave a certain gap between the hyperbolic aluminum veneers for subsequent filling and sealing treatment.

3、 Precautions

When installing hyperbolic aluminum veneer, the following precautions should be taken:

1. Ensure that the installation position is flat: The installation position of hyperbolic aluminum veneer should be kept flat to avoid affecting its aesthetics and stability.

2. Ensure firm fixation: The fixation of hyperbolic aluminum veneer should be firm and reliable to avoid problems such as detachment or deformation.

3. Pay attention to gap treatment: Leave a certain gap between the hyperbolic aluminum veneers to facilitate subsequent filling and sealing treatment. However, the size and position of the gap also need to be adjusted according to the actual situation.

4、 Conclusion and Suggestions

The installation of hyperbolic aluminum veneer requires sufficient preparation work and following the correct steps for operation. Attention should also be paid to details and security measures. For construction personnel, their technical level and sense of responsibility can be improved through strengthening training and management, thereby ensuring the installation quality and effectiveness of hyperbolic aluminum veneer.


Online Service
Contact information

Hotline number

13690800807

Working hours

Monday to Sunday

Company Office Number

+86 15627778610

UnitedsystemmeWe