Switch language:简体中文 | English

Professional aluminum plate production and wholesale manufacturer

We have been focusing on customized design of aluminum veneer for many years, and choosing us is not wrong!

Information Hotline:

+86 15627778610

Supreme Building Materials (Guangdong) Co., Ltd

Industry information

Company News

Industry dynamics

Frequently asked questions

contact us

Mobile:+86 15627778610

Email: 2201229786@qq.com

Address: No. 5 Binjiang Road, High tech Zone, Zhaoqing City, Guangdong Province

Analysis of Construction Process for 2.5mm Ceiling Aluminum Single Panel

  • Author: Supreme Building Materials (Guangdong) Co., Ltd
  • Release time: 2022-03-15 04:40:48
  • Click:0

2.5mm吊顶铝单板施工工艺解析



2.5mm ceilingAluminum veneerIt is a high-end building decoration material, and its construction process is very important to ensure its aesthetics and service life. Below is a detailed introduction to the construction process of 2.5mm ceiling aluminum veneer.

1、 Preparation work

Before carrying out the construction of 2.5mm suspended aluminum veneer, some preparation work needs to be done. Firstly, it is necessary to determine the installation location and height, and measure and calculate according to the actual situation. Secondly, necessary tools and materials need to be prepared, such as electric drills, screwdrivers, level gauges, keels, etc. Finally, the keel needs to be installed and fixed according to the design requirements to ensure the stability and safety of the aluminum veneer.

2、 Install the keel

Before installing the 2.5mm ceiling aluminum veneer, it is necessary to install the keel first. Generally speaking, the keel can be made of materials such as wooden keel or light steel keel. During installation, it is necessary to measure and adjust according to the actual situation to ensure that the flatness and verticality of the keel meet the design requirements. At the same time, it is necessary to fix the keel to the wall or ceiling to ensure the stability and safety of the aluminum veneer.

3、 Install aluminum veneer

When installing 2.5mm ceiling aluminum veneer, it is necessary to first place the aluminum veneer on the keel and adjust it with a level to ensure that the flatness and levelness of the aluminum veneer meet the design requirements. Then use a screwdriver to fix the aluminum veneer onto the keel, and be careful not to damage the surface of the aluminum veneer. After installation, it is necessary to conduct inspections and adjustments to ensure that the flatness and verticality of the aluminum veneer meet the design requirements.

4、 Processing of border strips

After installing the 2.5mm ceiling aluminum veneer, it is necessary to perform edge trimming treatment. Generally speaking, edge strips can be used to cover the edges of aluminum veneers to ensure their overall aesthetic appeal. Choose the appropriate size of the edge strip and fix it on the aluminum veneer.

5、 Acceptance check

After completing the installation of 2.5mm suspended aluminum veneer, acceptance is required. Check whether the flatness, verticality, and levelness of the aluminum veneer meet the design requirements, and whether the edge strips are firm and aesthetically pleasing. If any problems are found, they need to be adjusted and repaired in a timely manner.

The construction process of 2.5mm suspended aluminum veneer includes preparation work, installation of keel, installation of aluminum veneer, edge strip treatment, and acceptance. During the construction process, attention should be paid to safety and quality issues, and relevant construction specifications and standards should be followed. Only by strictly following the construction process can the aesthetics and service life of 2.5mm suspended aluminum panels be guaranteed.