Switch language:简体中文 | English

Professional aluminum plate production and wholesale manufacturer

We have been focusing on customized design of aluminum veneer for many years, and choosing us is not wrong!

Information Hotline:

+86 15627778610

Supreme Building Materials (Guangdong) Co., Ltd

Industry information

Company News

Industry dynamics

Frequently asked questions

contact us

Mobile:+86 15627778610

Email: 2201229786@qq.com

Address: No. 5 Binjiang Road, High tech Zone, Zhaoqing City, Guangdong Province

Is the construction period of aluminum veneer long?

  • Author: Supreme Building Materials (Guangdong) Co., Ltd
  • Release time: 2022-03-19 23:59:00
  • Click:0

铝单板的施工周期长吗?



Aluminum veneerAs a new type of building material, its construction period may be slightly longer compared to traditional materials such as stone and glass curtain walls. This is mainly because the installation of aluminum veneer requires multiple processes and processing, including the procurement, transportation, and installation of aluminum veneer. Below is a detailed introduction to the construction period of aluminum veneer and the factors that affect its construction period.

1、 Construction period of aluminum veneer

The construction period of aluminum veneer mainly includes the following stages:

1. Aluminum veneer procurement stage: At this stage, it is necessary to select suitable aluminum veneers based on design drawings and specification requirements, and communicate and negotiate with suppliers to determine the procurement quantity, price, and other related matters. The duration of this stage is generally 1-2 weeks.

2. Aluminum veneer transportation stage: After the aluminum veneer procurement is completed, it needs to be transported to the construction site. The duration of this stage depends on factors such as the quantity and distance of aluminum veneers, and is generally 1-3 days.

3. Aluminum veneer processing stage: After the aluminum veneer arrives at the construction site, it needs to be processed, such as cutting, punching, slotting, etc. The duration of this stage depends on factors such as the quantity and size of aluminum veneers, and is generally 1-2 weeks.

4. Aluminum veneer installation stage: After the aluminum veneer processing is completed, installation treatment such as fixing, connecting, sealing, etc. is required. The duration of this stage depends on factors such as the quantity of aluminum veneers, installation difficulty, etc., and is generally 1-2 weeks.

2、 Factors affecting the construction period of aluminum veneer

The construction period of aluminum veneer is influenced by various factors, mainly including the following aspects:

1. Quantity of Aluminum Veneers: The more aluminum veneers there are, the longer the construction period. Because it requires more time to process and install aluminum veneer.

2. Aluminum veneer size: The larger the aluminum veneer size, the longer the construction period. Because more time is needed for processing and installation.

3. Construction difficulty: If the construction difficulty is high, the construction period will also increase accordingly. For example, if high-altitude operations or construction are required under complex terrain conditions, more time and labor costs are needed.

4. Weather conditions: Weather conditions can also affect the construction period of aluminum veneer. For example, if encountering adverse weather conditions such as heavy rain, strong winds, etc., it will affect the transportation and installation of aluminum veneer, thereby extending the construction period.

The construction period of aluminum veneer may be slightly longer compared to traditional materials such as stone and glass curtain walls, but the specific situation still needs to be determined according to the actual situation. In the actual construction process, it is necessary to pay attention to the coordination and cooperation of each link to shorten the construction period and ensure the quality of the project.