Switch language:简体中文 | English

Professional aluminum plate production and wholesale manufacturer

We have been focusing on customized design of aluminum veneer for many years, and choosing us is not wrong!

Information Hotline:

+86 15627778610

Supreme Building Materials (Guangdong) Co., Ltd

Industry information

Company News

Industry dynamics

Frequently asked questions

contact us

Mobile:+86 15627778610

Email: 2201229786@qq.com

Address: No. 5 Binjiang Road, High tech Zone, Zhaoqing City, Guangdong Province

Construction precautions and techniques for 2mm aluminum veneer

  • Author: Supreme Building Materials (Guangdong) Co., Ltd
  • Release time: March 18, 2025 17:51:12
  • Click:0

2mm铝单板的施工注意事项和技巧



2mmAluminum veneerAs a commonly used building decoration material, its construction quality and effect directly affect the overall aesthetics and usability of the building. Below, we will provide a detailed introduction to the construction precautions and techniques for 2mm aluminum veneer from multiple perspectives.

1、 Material preparation

Before construction, it is necessary to inspect the required 2mm aluminum veneer to ensure that its size, color, quality, etc. meet the design requirements. At the same time, it is necessary to prepare corresponding tools and equipment, such as electric drills, electric saws, cutting machines, corner codes, screwdrivers, etc.

2、 Wall treatment

Before installing 2mm aluminum veneer, the wall surface needs to be treated to ensure it is flat, clean, and firm. The specific processing methods include: cleaning dust, oil stains, and other debris on the wall surface; Measure the flatness of the wall surface with a spirit level; Use wooden or light steel keel to reinforce the wall surface; Apply moisture-proof coating or sealing primer, etc.

3、 Aluminum veneer installation

1. Determine installation location: Determine the installation location and quantity of 2mm aluminum veneer according to design requirements and actual situation.

2. Use corner code fixation: Fix the corner code on the wall, then place the 2mm aluminum veneer into the corner code and fix it with a screwdriver.

3. Installation of connectors: If connectors (such as tension bars, hanging bars, etc.) need to be installed on 2mm aluminum veneer, they need to be fixed on the 2mm aluminum veneer first, and then fixed on the wall.

4. Surface treatment: After installation, the surface of 2mm aluminum veneer needs to be treated to ensure its aesthetics and durability. The specific treatment methods include: polishing the surface, cleaning the surface, spraying topcoat, etc.

4、 Safety precautions

During the construction process, it is necessary to pay attention to safety and avoid accidental injuries.

2. Professional tools and equipment should be used, and inappropriate tools and equipment should not be used.

3. It is necessary to wear protective equipment such as gloves, masks, helmets, etc.

4. It is necessary to comply with relevant safety regulations and operating procedures to ensure the safety and stability of the construction process.

5、 Summary

The construction of 2mm aluminum veneer requires attention to various details and techniques to ensure its quality and effectiveness. In the future development, we should continue to strengthen technical training and management, improve the skill level and management ability of construction personnel, and jointly promote the sustainable development of the construction industry.